2004 Classroom Remodeling
Common Area

July 19, 2004
Photograph: Common Area, concrete poured to level floor, base for wainscoating installed.
  July 16, 2004
Photograph: Common Area, cleaning up the area.
July 14, 2004
Photograph: Common Area, lockers east of Room 102 painted.
  July 13, 2004
Photograph: Common Area, lockers between Room 100 and 102 painted.
July 12, 2004
Photograph: Common Area, repaint lockers outside Room 102.
  June 23, 2004
Photograph: Common Area, base for wainscoating installed.
June 22, 2004
Photograph: Common Area, conduit channels filled with concrete.
  June 17, 2004
Photograph: Common Area, installing conduit in floor.
June 16, 2004
Photograph: Common Area, upright electrical conduit removed.
  June 9, 2004
Photograph: Common Area, new ceiling grid installed.