2004 Classroom Remodeling
Room 102

June 23, 2004
Photograph: Room 102, conduit to tables on side of room.
  June 22, 2004
Photograph: Room 102, concrete ramps to front of room poured.
June 22, 2004
Photograph: Room 102, concrete ramp to front of room poured.
  June 21, 2004
Photograph: Room 102, base for wainscoating installed.
June 21, 2004
Photograph: Room 102, working on heating and cooling.
  June 18, 2004
Photograph: Room 102, continue framing for wainscoating.
June 18, 2004
Photograph: Room 102, continue framing for wainscoating.
  June 17, 2004
Photograph: Room 102, continue installation of frame and base for wainscoating.
June 16, 2004
Photograph: Room 102, installing base for wainscoating.
  June 16, 2004
Photograph: Room 102, framing for wainscoating.